PARTNER
??? ??? ??? ??
?? / ????? / ??

??? ?? ???? ????? ??? ???????? ???? ?? (Harvesting Productivity and Cost of Whole-Tree Clear Cutting Using a Tower Yarder in a Larix leptolepis Stand)

6 ???
????
????? 2025.04.11 ????? 2014.02
6P ????
??? ?? ???? ????? ??? ???????? ???? ??
  • ????

    ????

    ¡¤ ???? : ????? ???????
    ¡¤ ??? ?? : Journal of forest and environmental science / 30? / 1? / 107 ~ 112???
    ¡¤ ??? : ???, ???, ???, ???, ???

    ??

    The productivity and cost of clear cutting operations were examined to broaden our knowledge on the harvestingsystem in a Larix leptolepis stand of Korea. The harvesting system was divided into tree operations which were chainsaw (STIHL MS440) felling, tower yarder (Koller301-4) yarding and harvester (WOODY H50) processing. The average cycle time of felling, yarding and processing were 98 s/cycle, 245 s/cycle and 150 s/cycle. The total stump-to-pile operational productivity was 43.07 m?/hr. The highest production activity was the felling 17.93 m?/hr, followed by the productivity of processing 15.62 m?/hr and then by the productivity of yarding 9.52 m?/hr. In addition the total stump-to-pile operational cost was 24,086 won/m?. The highest cost activity was the yarding 14,557 won/m? (60.4% of the total cost), followed by the costs of processing 8,461 won/m? (35.2%) and then by the costs of felling 1,068 won/m?.

    ????

    The productivity and cost of clear cutting operations were examined to broaden our knowledge on the harvestingsystem in a Larix leptolepis stand of Korea. The harvesting system was divided into tree operations which were chainsaw (STIHL MS440) felling, tower yarder (Koller301-4) yarding and harvester (WOODY H50) processing. The average cycle time of felling, yarding and processing were 98 s/cycle, 245 s/cycle and 150 s/cycle. The total stump-to-pile operational productivity was 43.07 m?/hr. The highest production activity was the felling 17.93 m?/hr, followed by the productivity of processing 15.62 m?/hr and then by the productivity of yarding 9.52 m?/hr. In addition the total stump-to-pile operational cost was 24,086 won/m?. The highest cost activity was the yarding 14,557 won/m? (60.4% of the total cost), followed by the costs of processing 8,461 won/m? (35.2%) and then by the costs of felling 1,068 won/m?.

    ????

    ¡¤ ??
  • ??????? ??? ??? ???

    ????? FAQ ???

    ? ?????

    • ??? ?? ? ??? ???? ??? ?????? ???? ???, ?? ?? ? ??? ???? ?? ?? ??? ?? ????? ????.
      ?? ? ??? ??? ??? ??, ?? ?????? ???? ????.
      ?????, ???? ? ?? ?? ?? ? ????? ????? ????? ??? ??? ????.
    • ?????? ???? ??? ??? ???? ???? ??? ???? ???, ??? 4?? ???? ??? ? ?????? ????.
      ???? ???? ??? ?? ??? ?? ?? ???
      ??? ????? ??? ?? ??? ????? ?? ?????? ?? ???? ?? ?? ?? ??? 70% ?? ??? ???? ?? (???? ??? ? ?? ?? ???) ???? ?? ???, ????, ??, ?? ?? ??? ??? ?? ??? ??? ?? ??? ??? ???? ?? ??
?? ??? ????? EasyAI
?????. ?????? ??? ?? ??? ???? ???? ??? ????? EasyAI ???.
?? ??? ?? ??? ??????.
- ??? ???? ???? ?????? ?? ??? ????.
- ??? ???? ?? ??? ??? ????.
- ????? ?? ??? ???? 1? ?? ?? ? ????. ?? ?? ??? ???!
?? ???? ??? ???.
- ???? ??? ????? ??? ??
- ???? ??? ??? ??? ???? ??? ??? ??? ???? ????, ???????? ???? ??? ??? ???? ??? ???? ?????
- ???? ???
?? AI ??? ????
???? ???? ??????.
2025? 06? 09? ???
AI ??
?????. ????? AI ?????. ??? ???????
2:26 ??